The hoisting of steel-faced magnesia composite air ducts is a technically demanding operation process that requires comprehensive consideration of support and hanger settings, hoisting techniques, safety control and other factors. A scientific lifting plan can not only ensure the long-term stable operation of the air duct system, but also effectively ensure the safety of construction workers and avoid material damage or safety accidents caused by improper operation. The hoisting process must comply with relevant national standards and be flexibly adjusted based on the actual situation on site.

 

Adequate preparation before hoisting is the basis for ensuring the smooth progress of air duct hoisting. This link needs to be comprehensive and meticulous.

Before hoisting, the production quality and performance test report of the finished air duct should be carefully checked, including key indicators such as duct strength, air leakage per unit area, fire resistance limit, etc., and it can be put into use only after it is confirmed to be qualified.

At the same time, it is necessary to complete the measurement, positioning and laying out of the position, elevation and direction of the air duct, and conduct a technical review to ensure that it meets the design requirements. The location of the reserved holes in the building structure should be correct, and the size of the holes should be 100mm or more larger than the outside size of the air duct.

It is also necessary to check whether the air duct has any quality defects such as deformation or scratches, and check whether the air duct specifications correspond to the installation location in the drawing. Prepare the required lifting equipment, tools and labor protection supplies to create good conditions for the lifting operation.

 

The support and hanger system is the core support structure for air duct hoisting, and its production and installation must meet strict regulatory requirements.

The materials of fixings, hangers, cross arms and all accessories of supports and hangers shall comply with the requirements of their load ratings and application parameters. The boom should be straight, the threads should be complete and smooth, and the nut and boom buckle should engage tightly.

The spacing between supports and hangers should be reasonably determined based on the size of the air duct. When the inner side length of the air duct is not greater than 400mm, the spacing is not greater than 2400mm; when the inner side length of the air duct is not greater than 1250mm, the spacing is not greater than 2200mm; when the inner side length of the air duct is greater than 1250mm, the spacing is not greater than 1800mm.

The distance between the support and hanger from the end of the air duct should not be greater than 1000mm, the distance from the starting point of the horizontal elbow should not be greater than 500mm, and the distance between the support and hanger on the branch pipe and the main pipe should not be greater than 1200mm. The gap between the rectangular air duct facade and the boom should not be greater than 150mm.

 

Standardized hoisting technology is the key to ensuring the quality of air duct installation, and scientific operating methods need to be mastered.

The air duct hoisting should be assembled in sections of 4-6m long, and the system sections should be hoisted as a whole at 4-6 points with a zipper hoist or pulley assembly to speed up the progress and avoid hoisting deformation of the air duct. During installation, the main pipe should be installed first, and then the branch pipe should be installed after the main pipe is installed and positioned.

For air ducts with larger hoisting dimensions and heavier total volume, more than 6 hoisting points should be set up. When hoisting the air ducts, assemble the air ducts on the ground, hang the hoist on the lifting rod erected on the side of the air duct, and lift the air duct to the installation height at a uniform speed.

The part of the air duct that penetrates the wall should be handled according to regulations. All air ducts that penetrate the wall should be equipped with embedded pipes or protective casings, and the thickness of the steel plate should not be less than 1.6mm. The space between the air duct and the protective casing should be sealed with flexible materials that are non-combustible and harmless to the human body.

 

The safety control of hoisting operations is very important, and a complete safety guarantee system needs to be established.

Tools and rigging should be carefully checked before lifting, and defective or damaged tools and rigging must not be used. Before officially lifting the air duct, a trial lifting should be carried out to carefully check whether the stress point of the inverted chain or pulley and the rope binding the air duct are firm, and whether the center of gravity of the air duct is correct and not tilted.

When hoisting the air duct, it is strictly forbidden for people to stand under the air duct being lifted, and it is strictly forbidden to stand on the air duct. Scaffolding used for high-altitude operations must be firmly erected and equipped with positions for personnel and equipment.

The hoisting of air ducts must not be stopped midway to avoid danger; if it must be stopped midway, the boom or rope should be temporarily tied and fixed to the structure, but it must be completed before the end of the day.

 

The fixing and inspection work after the air duct is in place cannot be ignored. This is the guarantee for ensuring long-term stable operation of the system.

After the air duct is hoisted in place, the position should be fixed immediately with formal cranes and brackets, and temporary ropes such as iron wires are not allowed to be fixed. At both ends of the contact surface between horizontally installed air ducts and supports and hangers, galvanized angular gaskets with a thickness greater than or equal to 1.0mm, a width of 60 to 80mm, and a length of 100 to 120mm should be provided.

For horizontally suspended main air ducts or system air ducts longer than 20m, at least one anti-sway support hanger or fixed point to prevent swinging should be installed. When the length of the air duct is >10M, reinforcement supports should be installed to prevent the air duct from swinging.

After the air duct system is installed, the installed main and dry air duct segments should be rigorously inspected and should comply with the relevant provisions of the current national standard "Construction Quality Acceptance Code for Ventilation and Air-Conditioning Engineering" GB 50243 and the current industry standard "Technical Specifications for Ventilation Ducts" JGJ/T 141.