What Is The Installation Process For Steel-faced Magnesia Composite Air Duct Panels?

Sep 17, 2026 Læg en besked

The installation of steel-faced magnesia composite air duct panels must follow a standardized procedure. Pre-installation preparations include on-site measurements and layout marking, panel inspection, and the preparation of specialized tools. Panels are cut using dedicated machinery to ensure straight edges, with debris cleared promptly after cutting. Duct assembly begins with straight sections; specialized sealant is applied to the panel joints before they are fitted together, using a rubber mallet to ensure a tight fit. Corner connections are reinforced with specialized corner fittings, and both internal and external corners are sealed.

 

Duct reinforcement is determined by dimensions; internal supports are required when the length of the longest side exceeds 800 mm, with a maximum spacing of 1000 mm. The spacing between supports and hangers is kept within 2.5 meters, and anti-corrosion wooden pads are installed at points of contact with the duct. Irregular components-such as tees and elbows-are either factory-prefabricated or precision-fabricated on-site to ensure smooth airflow. Specialized sealing strips are used at flange connections, with a maximum bolt spacing of 120 mm. Flatness and verticality are monitored throughout the installation process to ensure overall deviations remain within specified limits. Finally, system testing-including air leakage tests and visual inspections-is conducted to verify that the installation quality meets design requirements.